Clean rooms for high-precision coatings
When you talk about electrodes it seems like the relevant engineering is in the catalyst. The reality is that the manufacturing environment is equally critical: a 10 µm particle landing during coating creates a failure point that will cut the electrode life by thousands of hours.
Our facilities
The Jolt Solutions plant has two ISO 7 clean rooms (10,000 particles/m³ > 0.5 µm) dedicated to:
- Catalytic precursor preparation.
- SPARKFUZE™ application.
- Inspection and packaging of the finished electrode.
Procedures
Restricted access with airlocks, decontaminated personal equipment, continuous particle monitoring and HEPA filters replaced every 6 months. The cleanroom level can step up to ISO 6 for special runs under contract.